Glenala SHS

Performing Arts Centre Upgrade
Project Date:

Term 3 & 4 2024

Project Date:

Term 3 & 4 2024

Location

Durack QLD 4077

Project Overview

Macrosphere delivered a full upgrade to Glenala State High School’s Performing Arts Centre (PAC), transforming the original small facility into a modern, high-performance space.

The project involved a complete redesign and expansion, delivering a state-of-the-art system to support the school’s growing Performing Arts and Music programs.

This Department of Education-funded project reflects a broader investment into performing arts infrastructure across schools, ensuring students have access to industry-relevant environments.

Scope of Works

  • Full design, supply, and installation of integrated PAC systems
  • Collaboration with builder under strict timelines
  • Retrofit integration within existing structure
  • System optimisation for multiple use cases
AVoverIPCurtainsLightingProjectorTruss

Key Features & Systems

  • Full Truss System
    Entire stage system can be lowered to safe working heights, including curtains, lighting, foldback speakers, and projection equipment.
  • Automated Lighting Infrastructure
    Fully automated front-of-house lighting bars for efficient operation and flexibility.
  • Professional Audio System
    Line array speaker system delivering high-quality sound coverage across the venue.
  • Q-SYS Control System
    Custom-designed control modes including:
    • Simple mode (day-to-day use)
    • Performance mode
    • Presentation mode (rear seating deck use)
  • AV over IP Network
    Fully integrated AV over IP system providing flexibility, scalability, and long-term future-proofing.
  • Stage & Venue Integration
    • Automated front-of-house curtains
    • Talkback communication systems
    • Four projector locations
    • Foyer paging, audio, and stage visualisation
  • Back-of-House Facilities
    • Green rooms and dressing rooms
    • Infrastructure aligned with professional theatre environments

CHALLENGES

  • Tight construction timeframe
  • Working within an existing structure (retrofit constraints)
  • Limited site access requiring careful coordination and staging

OUTCOME

The completed PAC delivers a high-performance, industry-aligned environment that enhances both learning and production capabilities.

Students now have access to technology and systems comparable to professional venues, supporting pathways into performing arts, music, and technical production careers.

Our Specialist AV Service